New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Saturday, April 27, 2019

P.C.C.M. 60 /NYCTL Part 4

Greetings All,

Welcome back to the P.C.C.M. 60 series!!!


This weekend the participating layouts will be posting their inbound freight car moves. The NYCTL will be receiving cars from PC Ralph's Kings Port Division, Sir Neal's Atlantic Pacific RR and John B's Los Feliz & North Western RR.

We'll pick up the action at Empire City with daily PC Train VN-4 making its way from Selkirk Yard towards Terminal Yard with freight cars from the aforementioned layouts.

VN-4 rolls thru Bedford NY towards Terminal Yard

VN-4 arrives at Terminal Yard. The three leading F7As were tacked onto the front of the F7A - GP30 combo that came out of West Mill on the KPD in the opening PCCM 60 series. That sure likes like 1/87th scale PC Ralph at the helm! 
With VN-4 now in the yard it's time to turn it over to the Yard Job. Before doing that I prepared these nifty looking PC switch lists that came my way from 1:1 PC Ralph. They look great and really help make the sorting and blocking of the inbound cars go smoothly.
The Yard Job with switch lists in hand gets to work coupling onto VN-4s caboose. TPFX #5510 loaded with apples from Vancouver for Empire Produce has the distinction of being the first PCCM car.
This quartet of reefers from C&P Restaurant Supply in Rock Ridge NJ on the APRR are loaded with foodstuffs that will go to Terminal Warehouse & Cold Storage within the Terminal Yard yard limits.
The Yard Job has VN-4s freight cars pretty much sorted out and is now running the caboose to the caboose track. To the left we see an EMD prime mover being loaded onto a PC depressed center flatcar and a PC gon filled with engine terminal scrap.
The Yard Job heads back to take care of the remaining switch work. To the right is Train EC-1, the Terminal Yard to the Empire Belt RRs North Side Yard morning transfer run. Next to that are three cars for the LIRR which will need to go to North Side Yard as well. There are two covered hoppers for Bedford NY industries and the remaining cars on track 6 will be worked within the yard limits.      
The tail end of EC-1 features cars for Walsh Steel Wool, Superior Furniture, Gervais Pipe and Ralph's Grocery Warehouse.
VN-4s motive power heads into the engine terminal as work continues at the shop. The two gons of scrap and depressed flat with prime mover look to have their next PCCM loads in place.
Meanwhile the Yard Job is pulling cars from the Terminal Warehouse & Cold Storage buildings.
The three green EBRR 57' Reefers and orange AP 50' RBL from C&P Restaurant Supply in Rock Ridge are now spotted at  Terminal Warehouse & Cold Storage.
With the reefers now placed the YJ shoves empty EBRR coal hopper #416582 returning from the LF&NW into track #7 building another train of empty coal hoppers for Hudson Coal. 
PRR X29 #9553 returning empty to home rails from the LF&NW is shoved into track 5 with other empty boxcars. 
Word has come down from the yardmaster that dues to the length of EC-1 the cars for Bedford and the LIRR will dispatched as an Extra. A crew has been called as the YJ gets the Extra ready for departure. 
We'll cut it off here for today with engine hostler Wet Willie having coupled NYC GP20 #2103 onto the outbound Extra. We'll pick it up tomorrow with Extra 2103 and EC-1 making their runs.  


For more PCCM 60 action follow long on the 
and

The LF&NW has been temporarily sidelined 
along with the Ralston Creek RR 
We hope to have them back in operation for PCCM 61.

Thanks for reading and watching!!!
See ya tomorrow!!!

Monday, April 22, 2019

P.C.C.M. 60 / NYCTL Part 3

Greetings All,


Welcome back to the P.C.C.M. 60 Series!!!

We'll finish up the NYCTL's outbound portion today and pick up the action at Bedford NY with EBRR Train EB-4 heading towards Terminal Yard and passing the Bedford Turn, Train BT-27. 
EB-4 slips and slides into Terminal Yard.
BT-27 has it's engine in the lead and the train is ready to leave Bedford and head back to Terminal Yard.
BT-27 returns to Terminal Yard. 
Now it's time for the Yard Job to get everything set up. I find it very helpful to prepare a list of the cars leaving, where they came from, where they are going and how to block them for departure. 
The YJ starts its work by pulling loaded hoppers from the Coal Job.
The YJ is now working the cars brought in on EBRR Train EB-4. The GP-7 is pulling the cars down track 8 to pass the switch to track 9 to get to the engine terminal. To the right we can see our outbound train, Train NG-3 to Dewitt via Selkirk, starting to be built. 
The YJ has shoved the PC depressed center flat and two PC gons into the engine terminal for their next P.C.C.M. loads
The YJ is now working the front end of EB-4 and preparing these three cars for departure to the L.F.N.W. The Masonite All Door boxcar and LF.N.W. #160 are empties heading back to CA via Reiden Lake. The D&H 19123 is loaded with ink for Forley Lithographers in Manhattan Transfer via the West Egg car float. 
Our outbound train is taking shape. Block 4 can be seen in the distance with the cars for the L.F.N.W. D&H 19123 is just ahead of the caboose as it will be pulled off the train first for the West Egg car float. Block 3 consists of two hoppers of ore and six hoppers of coal going to Kings Port Steel, NYC Early Bird boxcar going to Boom's Ready Mix and PC gon #288673 going to the Hudson Valley Ag Coop. This block will be going to Williams Yard on the K.P.D. for delivery to their respective consignees.
Yard Job B has come over to pick up three empty PC 50' RBLs sitting on track 8. They are consigned to Bruce Electric Equipment within the Terminal Yard yard limits.
Over at Bruce Electric Equipment these three NYC 50' boxcars loaded with wire and cables for IBM in Binghamton NY on the KP&W are ready to go.
Yard Job B delivers the loaded NYC boxcars to track 8 for the Yard Job to add to our outbound train, NG-3.
The three PC RBLs are spotted at Bruce Electric Equipment for their next P.C.C.M. load.
Block 2 is now in place. The three NYC cars for IBM in Bingo Town, P&E #3638 from Reliable Machine Works loaded with a milling machine for Blue Ribbon Flour along with 
 B&M RBLs 109 & 110 loaded with cabinets for Zenith and PC #229036 loaded with labels for Van Winkle Canning. These cars will be delivered to their consignees out of the K.P.D.s West Mill Yard  
The Yard Job tacks on Block 1 consisting of these two empty EBRR boxcars specially painted for auto parts service going to IDEAL Auto Parts in Rock Ridge NJ on the A.P.R.R.  
The power called for our outbound train is a mix of EMD and GE units. The engines have left the engine terminal and are headed to the yard to couple up to their train. 
1/87th scale Kar Knocker has given NG-3 the OK to depart while Big Mike looks on at his favorite engines, GP30s and U Boats, in the same consist. 

Train NG-3 rolls into Bedford NY

Train NG-3 crosses onto Main 2 at Bedford Tower under the watchful eyes of tower operator 1/87th scale John B.
 NG-3 crosses the Empire City viaduct. Next stop Selkirk!
That wraps up the NYCTL's outbound portion of P.C.C.M. 60. The inbound portion will start next week once the guys finish their outbound moves and we have a chance to run those train movements. 
Be sure to checkout the other virtual ops layouts!
Sir Neal's Atlantic Pacific RR
may be sidelined due to 1:1 workload

Thanks for reading!!!
See ya soon!!!

Sunday, April 21, 2019

P.C.C.M. 60 / NYCTL Part 2

Greetings All,


Welcome Back to the PCCM 60 series!!!

We open up today at Terminal Yard with 1/87th scale Alco Joe getting called for the Coal Job. Engine hostler Wet Willie continues to try and get in Alco Joe's good graces by putting this four unit Alco lash up together. 1/87th scale Kar Knocker looks on as Wet Willie points out his latest peace offering.
The four Alcos will be put to the test today. The Coal Job's first assignment is to shove these three PC ore cars up the grade to T&R Gravel
and pull these two hoppers loaded with ore for Kings Port Steel on the KPD.  
Next stop is Hudson Coal where 1/87th scale Alco Joe and his conductor / brakeman will swap out empties for loads. Six loaded hoppers will be headed to Kings Port Steel to fuel their furnace.
The loads are pulled and coupled up to the rear of the empties as the train head towards Bedford Tower.
The loaded coal hoppers are dropped on Main 3 as the Coal Job crosses over to Main 2 at Bedford Tower with two hoppers of ore and fifteen empties for Hudson Coal.
The empties ae now spotted and the Coal Job conductor / brakeman gets ready to jump on the NYC hopper loaded with ore as the Coal Job departs from Hudson Coal.
1/87th scale Alco Joe has the Coal Job back together and awaits the passing of the Long Island Railroad transfer run to the Empire Belt's North Side Yard to clear the main.
The L.I.R.R. passes Bedford Tower and gets a highball from tower operator 1/87th scale John B to proceed to Empire City.
With the main now clear 1/87th scale Alco Joe notches up his four units and heads towards Terminal Yard.
The Coal Job arrives at Terminal Yard and heads into track 8 for the weigh in motion scale.
Back at Empire City the L.I.R.R. trundles along passing the new Empire City Station as it makes its way to North Side Yard.
The L.I.R.R. arrives on track 2 at North Side Yard and is greeted by the trainmen of the E.B.R.R. The L.I.R.R. engine will cut off from it's train here and move forward to couple up to the boxcars waiting on track 2. Nice job 1/87th scale senior engineer Sir Neal prepping the yard for this time saving maneuver! 
The L.I.R.R. engine has its outbound boxcars in tow and heads back to the Hohman Ave yard entrance to reclaim the caboose. 
The L.I.R.R. has quickly coupled up to their caboose and is ready to leave. 
The L.I.R.R. transfer run heads out of town thru the west side.
Rolling thru Bedford NY while heading back to Bliss Yard on Main 2 the L.I.R.R. meets the Bedford Turn, Train BT-27, on Main 3.
BT-27 is now working the siding and shoving the PC boxcar loaded with labels for Van Winkle Canning from Berk Enterprises back towards University Millwork to pull the two B&M RBLs loaded with cabinets for Zenith. Both consignees are located in Bloomberg NY on the K.P.D.
BT-27 has completed its switch work and idles on Main 3 waiting for Empire Belt RR Train EB-4 to pass on Main 2 on its run from North Side Yard to Terminal Yard. Once EB-4 clears Main 2 BT-27 will run the engine around to prep the train for its run back to Terminal Yard. 
It won't be long for BT-27 as EB-4 is leaving North Side Yard. 
The three covered hoppers from the earlier L.I.R.R. transfer run will remain at North Side Yard for later spotting at Empire City industries for their next P.C.C.M. loads.
We'll close it out here for today with train EB-4 meeting BT-27 at Bedford as EB-4 makes its way to Terminal Yard.
Tomorrow we'll close it out on the NYCTL with the Yard Job and the dispatch of our outbound train.


Be sure to checkout the other virtual ops layouts!
Sir Neal's Atlantic Pacific RR
may be sidelined due to 1:1 workload

Thanks for reading!!!

See ya Tomorrow!!!