New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Friday, July 23, 2021

Penn Central Car Movements #85 / N.Y.C.T.L. Part 1 / The Outbound Cycle Begins

 Greetings All,

Welcome to Penn Central Car Movements #85!!!

This virtual op will be a three layout affair with my N.Y.C.T.L. interchanging freight cars with PC Ralph's Kings Port Division and Sir Neal's Atlantic Pacific RR. 

It's early in the morning at Bedford Park Yard as engineer Robert R begins his day. The two empty APRR 86'ers and one empty EBRR 50'er need to be returned to the APRR Rock Ridge Yard to be forwarded back to IDEAL Auto Parts for reloading.

The BPY Job pulls PC boxcar #160502 from American Hardware Supply loaded with Bulk Hardware for Peerless Appliance in Mayfield NY which is served by the Kings Port & Western RR via interchange with the Penn Central's Kings Port Division. 

Two empty Evans Coil Coaches get pulled out from the Ford Plant for return to Kings Port Steel.

Robert R pulls the cars from the yard and heads back to the Ford Plant.

Empty APRR 60' and EBRR 86' boxcars get pulled from the Ford Plant. These cars are also going to Rock Ridge Yard for forwarding to IDEAL Auto Parts.


Train BP-12 heads for Terminal Yard

Robert R brings the BP-12 into Terminal Yard

The Alco S-4 glides into the engine terminal for refilling of sand and fuel.

Big Mike pulls the caboose from the BP-12 and Kar Knocker gets ready to blue flag the train and do his thing. 

Big Mike takes this time to head over to the Pier 16 holding tracks to pull out a group of empty auto parts cars.

The empty PRR, NYC and EBRR boxcars are all going to the APRR Rock Ridge Yard to be forwarded to IDEAL Auto Parts.  

Kar Knocker has completed his car knocking and Big Mike is building newly implemented hotshot Train APR-25(Auto Parts Return-25) that will expedite these empties from Terminal Yard to Rock Ridge Yard running thru Selkirk and Weehawken.

Next we catch Big Mike shoving cars going to the Kings Port Division and the Kings Port & Western RR into track #4.

Big Mike is on a roll (not a hard roll!) as he continues working the yard limits industries. Below he is making a long pull from Terminal Warehouse and Cold Storage.

The BAR 57' reefer #11128 and NPM 50' reefer #473 are loaded with frozen food for C&P Restaurant Supply in Rock Ridge NJ. The EL 57' reefer and APRR #58279 will head out in local trains to fulfill some PCCM empty car requests.

The PC Hi Cube boxcar, pulled empty from Terminal Warehouse & Cold Storage, is shoved towards Pier 16 to fulfill an empty request.

The PC Hi Cube #272742 is left here for the Pier 16 Switcher.

A short time later the Pier 16 Switcher couples up to the PC Hi Cube.

PC boxcar #272742 gets spotted at Bruce Electric Equipment for its next PCCM load.

Next we move over to Bedford NY as Jimmy Alco brings a long string of PCCM cars towards Empire City for interchange with the Empire Belt RR at North Side Yard.

The LIRR rolls thru Bedford NY and arrives at North Side Yard in Empire City


We'll cut it here for today with Jimmy Alco checking in at the North Side Yard office.

We'll pick it up tomorrow at North Side Yard and find out why the police have been there guarding P&E boxcar #3638.

Be sure to catch the action on PC Ralph's Kings Port Division and Sir Neal's Atlantic Pacific RR.

Thanks for reading and watching!!!
See ya tomorrow!!!

Saturday, July 17, 2021

Proto 2000 GP20 Repairs

 Greetings All,

While recently running my old Life Like Proto 2000 New York Central GP20s I noticed they weren't running that well in consist and heard a thumping noise from one that sounded like a flat wheel but experience tells me that it is a cracked axle gear. 

Here are the units getting shoved into the shop to await repairs on the workbench.  

A few days later the 6107 is on the workbench to investigate the front power truck not providing electricity to the motor. Investigation revealed the wire to have broken inside the insulation. You can see the kink midway between the soldered connection and where the wire goes to the motor thru the weight.

A new wire is soldered in place and the problem is solved.

The 6107 is placed on the ready ready track in the engine terminal.

Next on the bench is the 6109 and the cracked axle gear was quickly found. Cracked axle gears plagued certain Life Like Proto 1000 and 2000 models and I have changed a plethora of them over the years. 

I keep Athearn replacement gears in stock for just such issues. The NMRA HO Standards Gauge works well to set the wheels in gauge when putting the two axles and gear together.

Some of the cracked gears are used at Prestage Tool & Gear. Waste not want not!

Both the 6109 and 6107 are now back in service.

The 6107 and 6109 get the call for a merchandise train out of Terminal Yard.

The GP20s haul the train out of Terminal Yard and thru Bedford NY 

The wire issue in the 6107 has also reared its ugly head in some of my Life Like Proto 2000 E8 units over the years. In the past I've had crushed wires at the tops of the weights that caused sporadic running issues. Earlier this year I pulled out four E8s and three had either broken wires within the insulation or wires that came loose from soldered truck connections.

As noted above certain Life Like Proto 1000 and 2000 units were plagued with cracked axle gears. As my engine fleet and skill level have grown I've gone from replacing just the cracked gears in a specific unit to replacing them all at the first sign of  gear trouble. The cracked gear in the 6109 was an original Life Like gear. 

Modelers considering buying the original Life Like P-1000 and P-2000 whether still new or on the used market should inquire if the gears have already been replaced or be prepared to replace them. The GP20s, GP9s, FAs, FBs, and RS2s in my fleet have all needed gear replacement.

Here is a four unit NYC FA-FB-FB-FA project from 2015 where I  replaced all 16 axle gears. These units have had no issues since. 

Thanks for reading!!!
See ya soon!!! 

 

Sunday, July 11, 2021

Coal Train Op Video Compilations

 Greetings All,

A couple of PCCM 84 coal train op compilation videos set to music for your viewing and listening pleasure.

Outbound Compilation


Inbound Compilation


Penn Central Car Movements #85 scheduled to start on Friday July 23rd

Thanks for watching!!!
See ya soon!!!


Sunday, July 4, 2021

Penn Central Car Movements #84 / N.Y.C.T.L. Part 2 / Empty Hoppers Return

 Greetings All,

Welcome back to Penn Central Car Movements #84!!!

Our coal op concludes today with the empty coal hoppers from Sir Neal's Atlantic Pacific RR and PC Ralph's Kings Port Division  cycling back for reloading at Hudson Coal.

Our first inbound train, Extra 8150, with 24 empties from the Kings Port Division passes Bedford Tower as it heads for Terminal Yard.

Extra 8150 has arrived at Terminal Yard and gets a visual inspection by Kar Knocker as it passes over the scale.

See Extra 8150 make its way thru Bedford to Terminal Yard.


The 8150 and B unit 3469 head into the engine terminal thru wye.

The 8150 and 3469 ease into the sand rack.

Extra 3175 with twelve empties from the Atlantic Pacific RR follows Extra 8150 thru Bedford.

Extra 3175 rolls to a stop on the Bedford Secondary.

Extra 3175 gets the empty hopper train treatment before getting clearance to head into Terminal Yard.

Extra 3175 arrives (finally) at Terminal Yard and heads over the scale as Kar Knocker admires the rare orange C paint scheme.

GP40 3175 heads into the engine terminal thru the wye.

The 3175 joins the 8150 and 3469 at the sand rack.

Kar Knocker with Big Mike running the Yard Job do their familiar routine with Big Mike pulling off the empty hopper trains cabooses for Kar Knocker to blue flag and inspect the train.

A short time later Big Mike gets busy building a pair of empty local hopper trains for delivery to Hudson Coal as we keep our coal cycle going.

There's plenty of empties now in the yard and Big Mike has them well organized. Engine hostler Wet Willie has coupled on a trio of Alco Centuries and Alco Joe (rightfully so) gets the call for the last NYCTL Coal Job of this virtual op, Train CJ-1.

Train CJ-1 leaves Terminal Yard for Hudson Coal


Loads get pulled out at Hudson Coal.

The loaded hoppers are setout on the Bedford Secondary.

Alco Joe shoves the empties down the main towards Hudson Coal.

The empties are spotted for loading and the coal cycle continues.

The CJ-1 is back together on the Bedford Secondary.

Alco Joe heads for home.

The CJ-1 is back at Terminal Yard and Kar Knocker is out to inspect the trains as it rolls across the scale.

Alco Joe drops his power in the engine terminal and that concludes our three layout virtual op. Put it in the books!

Be sure to catch the action on PC Ralph's Kings Port Division and Sir Neal's Atlantic Pacific RR.

Thanks for reading and watching!!!
See ya soon!!!

Friday, July 2, 2021

Penn Central Car Movements #84 / N.Y.C.T.L. Part 1 / Coal Trains Get Dispatched

 Greetings All,

Welcome to Penn Central Car Movements #84!!!

The Coal Rush is on this weekend as Hudson Coal works to quench the thirst for black diamonds needed at industries and utilities on Sir Neal's Atlantic Pacific RR and PC Ralph's Kings Port Division

We open up this one weekend virtual op at Terminal Yard with Alco Joe called for the first Coal Job of the day, Train CJ-1, that will work Hudson Coal. The GP20 consist is one of Alco Joe's favorites and today he is more than happy to be GP20 Joe!

Train CJ-1 exits Terminal Yard

The CJ-1 starts pulling loaded hoppers from Hudson Coal. This block that includes the NYC and PRR hoppers will be going to Corning Glass Works in Corning NY.

Conductor Murray rides the last loaded hopper out of Hudson Coal.

After dropping it's caboose and loaded hoppers on the Bedford Secondary the CJ-1 crosses onto the main.

Empty hoppers get shoved down the main towards Hudson Coal.

The empties are spotted for loading.

CJ-1 is back together and heads back to Terminal Yard as an RDC heads down Main #1 for Empire City Station.

Alco Joe brings the CJ-1 into Terminal Yard and over the weigh in motion scales as Kar Knocker inspects the train.

Over at the Empire Belt RRs North Side Yard in Empire City, N.Y. PC Ralph prepares to deliver ten empty EBRR coal hoppers to Terminal Yard. The hoppers, stored here in serviceable condition, were requested by the Penn Central. PC Ralph and senior engineer Sir Neal are happy to see them go and earn revenue.

EBRR Extra 6719 heads thru Bedford for Terminal Yard


PC Ralph brings the empties into Terminal Yard across the weigh in motion scale.

PC Ralph departs Terminal Yard caboose lite as Kar Knocker heads over to blue flag the train for inspection.

Kar Knocker has cleared the EBRR hoppers and Big Mike running the Yard Job couples up to them to build our second coal train of the day, Train CJ-2.

A surprise guest engineer from the NYCTL Extra Board is none other than senior engineer Sir Neal. Big Mike and Kar Knocker ask the obvious question. "What's a high stepper like Sir Neal doing on a local coal job with first generation power?" 

Sir Neal shows he hasn't lost the touch no matter what kind of train or power he is working with. Watch Train CJ-2 make its moves to exchange empties for loads at Hudson Coal.

CJ-2 is back together and ready to head back to Terminal Yard.

Sir Neal brings the CJ-2 into Terminal Yard and across the weigh in motion scales as Kar Knocker inspects the train.

With the Yard Job's usual U23Cs at Selkirk for their monthly inspection Big Mike and his Baldwin S12s start building our outbound coal trains. Both the PRR (87) and NYC (21) contributed S12s to the PC roster

Engine hostler Wet Willie has the power coupled on and Kar Knocker gets Coal Extra 6533 ready to depart.

Coal Extra 6533 heads thru Bedford NY with 12 loads of coal for the APRR's Rock Ridge Yard. 
 

Extra 6533 passes Bedford Tower as it heads for Selkirk, the River Line and Weehawken Yard.

Following Extra 6533 thru Bedford NY is Coal Extra 4348 bringing twenty four loads of coal to the Kings Port Division.


Coal Extra 4348 passes Bedford Tower on it's way to Selkirk and the River Line to the Kings Port Division.

This wraps up the NYCTL Outbound portion of P.C.C.M. 84. The loaded coal trains should arrive at their destinations by tomorrow. The A.P.R.R. and K.P.D. crews will handle interchanges and deliveries to their coal customers. The empties will be forwarded back to Terminal Yard on Sunday and we'll pick up the inbound portion there.
                 
Be sure to catch the action on PC Ralph's Kings Port Division and Sir Neal's Atlantic Pacific RR.

Thanks for reading and watching!!!
See ya Sunday!!!!