New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Sunday, November 8, 2026

New York - New Jersey Ops #5 / Part 6

  Greetings All,

Welcome Back to New York - New Jersey Ops #5!!!
Our fifth NY-NJ Virtual Op with my NYCTL interchanging freight traffic with Sir Neal's Atlantic Pacific Railroad continues today.

The action starts in the engine terminal with Alco Joe reporting for "The Bedford Turn" and picking up a pair of Alco RS11s that will power today's train.
The RS11s are coupled onto the Bedford Turn, Train BT-27, freight consist.
The Bedford Turn, Train BT-27, departs from Terminal Yard.
The BT-27 rolls into Bedford on the mainline and blocks the station causing ire among the commuters once again.
The switching of the Bedford Industries begins at Neubaum's Coffee & Tea Importers. Note the commuters pointing out the locomotives being protected by the freight cars.
The BT-27 starts working the long siding that includes Hostess, Berk Enterprises, University Millwork and the Key Food Distribution Center.
More non NY-NJ freight cars are being pulled from the siding.
Non NY-NJ freight cars including the red, white and blue State of Maine Products boxcar get pulled from Key Food.
Conductor Murray is at Key Food to check with the shipping and receiving department to clarify how they want to handle the three loaded reefers and three loaded boxcars to be delivered to their siding that has only four spots for cars 50' or longer. 
With that issue cleared up conductor Murray and Alco Joe proceed with their switching duties. Two of the three B&M RBLs loaded with pasta products from Ronzoni will be going back to Terminal Yard until called for by Key Food.
The caboose is coupled onto the B&M RBLs for the move back to Terminal Yard.
Being shoved into the Key Food siding are three mechanical refrigerators loaded with NY-NJ frozen foods.
B&M RBL #110, loaded with macaroni from Ronzoni, makes the last of the four NY-NJ freight cars being delivered to Kef Food today.
Three Penn Central RBLs loaded with plywood veneers from Mike's Lumber in Rock Ridge, NJ are delivered to University Millwork. 
With the switch work done and the mainline now open Alco Joe checks in with the Bedford towerman.
A short time later a trio of PC covered wagons make an appearance at the tower.
A PC F7A-F7B-F7A lash up leads an empty hopper train out of the APRR Rock Ridge Yard to Terminal Yard.
The empty hopper train rolls into Terminal Yard.
The covered wagons are placed at the sand rack for servicing.
Back in Bedford Alco Joe is making his runaround move.
The RS11s are coupled onto the freight cars going back to Terminal Yard as Train BT-28. Alco Joe is out on the front porch of the 7604 which means he's being held for a train using the mainline.
The BT-28 holds for a surprise westbound train and then proceeds to Terminal Yard.
Alco Joe is back in the engine terminal making inquiries into the large number of foreign road power in this virtual op that includes the B&O GP38-2 #3837 making its NY-NJ debut.
The terminal switcher collects the cabooses.
The cabooses are shoved to the caboose track.
Kar Knocker has released both trains and Big Mike is ready to get to work.
B&M RBLs #105 and #109 loaded with Ronzoni products are constructively placed in yard track #7 pending delivery to Key Food. The demurrage clock is running...
Big Mike sets the empty hoppers on track #2 to await their next moves to their NY-NJ loads. 
Over in the engine terminal a PC engineer reports for Extra Train 9909 that will handle Water Street, the Bronx and Elmsford, NY NY-NJ freight traffic.
RS1s 9921 and 9909 couple up to their train. The Hi-Cube boxcars are loaded with appliances from the large RC Richard Distribution Center in Rock Ridge NJ that need to be delivered to the Empire City PC Richard warehouse.
Extra 9909 departs Terminal Yard.
After delivering the NY-NJ freight cars to Stella Doro in the Bronx and the A&P Warehouse in Elmsford, NY the 9909 returns to Empire City. 
Extra 9909 works the Empire City PC Richard warehouse.
The Hi-Cubes of appliances are delivered.
Extra 9909 prepares to depart for Terminal Yard.
Train Extra 9909 is cleared to leave the station.
We'll cut it here  for today with the RS1s leading their train into Terminal Yard.
We'll pick it tomorrow at the engine terminal with a PC engineer picking up the motive power for Train MR-1.
This concludes Part 6 on the NYCTL. Be sure to catch all the action on Sir Neal's Atlantic Pacific Railroad.
Thanks for reading and watching!!!
See you tomorrow!!!

Saturday, November 7, 2026

New York - New Jersey Ops #5 / Part 5

 Greetings All,

Welcome Back to New York - New Jersey Ops #5!!!
Our fifth NY-NJ Virtual Op with my NYCTL interchanging freight traffic with Sir Neal's Atlantic Pacific Railroad continues today with the B&O and PC taking center stage. 
The B&O Transfer departs 16th Street Yard for Terminal Yard.
The B&O Crew works Terminal Warehouse and Cold Storage.
After delivering the NY-NJ Hi Cube freight cars of appliances  to Montgomery Ward and six empty 57' reefers to Birdseye the B&O Transfer returns to 16th Street Yard.
The 16th Street Yard Transfer ties down in...That's right, 16th Street Yard. With the merging of the B&O and C&O and the creation of the the Chessie System perhaps we should start calling this the Chessie System Transfer? Probably not, habits did hard in the RR industry.
Next we check in with PC engineer Robert R. reporting to the Bedford Park Yard office or shack as it is known among the men.
Robert R starts his day working the Bedford Park Ford Plant by pulling a number of empty auto parts boxcars
The caboose is coupled on,
The PC RS2s are ready to depart from Bedford Park and head to Terminal Yard with the empies as Train BP-12.
Train BP-12 heads to Terminal Yard.
The BP-12 rolls thru Terminal Yard.
Big Mike is out quickly to pull the BP-12 freight cars from the arrival / departure track.
The BP-12 consist is shoved into track #4.
NY-NJ freight cars going to Bedford Park Ford Plant are pulled from track #5.
The auto parts cas and auto racks are set out on the arrival departure track.
Engineer Robert R has coupled onto the auto parts cars and chats with Kar Knocker as the RS2s build up the air pressure.
PC Train BP-41 is shoved out of Terminal Yard.
The BP-41 has arrived in the cozy confines of Bedford Park Yard and gets ready to deliver the empty auto racks.
Two Empire Belt boxcars of auto parts from IDEAL Auto parts in Rock Ridge NJ are placed at the Ford Plant.
Three APRR boxcars of auto parts from IDEAL in Rock Ridge, NJ are placed at the Ford siding.
With that done we'll cut it here for today as Robert R ties down in Bedford Park Yard. 
We'll pick it tomorrow back in Terminal Yard with Alco Joe reporting for "The Bedford Turn".
This concludes Part 5 on the NYCTL. Be sure to catch all the action on Sir Neal's Atlantic Pacific Railroad.
Thanks for reading and watching!!!
See you tomorrow!!!


Friday, November 6, 2026

New York - New Jersey Ops #5 / Part 4 / Inbound Trains Arrive

  Greetings All,

Welcome Back to New York - New Jersey Ops #5!!!
Our fifth NY-NJ Virtual Op with my NYCTL interchanging freight traffic with Sir Neal's Atlantic Pacific Railroad continues today with inbound NY-NJ freight cars from the PC Reynolds Intermodal Terminal and APRR Rock Ridge Yard arriving at the Penn Central Terminal Yard.

Hotshot Train NJNY-2 with PC U28C #6533 leading will do the honors of opening the NY-NJ Op #5 Inbound series.
The NJNY-2 proceeds to Terminal Yard and the TOFC Ramp.
After cutting from its train the 6533 backs thru the engine terminal wye to be turned for its next assignment.
The 6533 is parked at the sand platform to begin its servicing.
With the NJNY-2 settled in the yard we find Train JODN returning from BN Yard in the Bronx.
Train JODN heads for Terminal Yard.
The JODN arrives in the yard.
After cutting off from the JODN freight consist Alco Joe places the RS32s at the sand rack.
The terminal switcher pulls the caboose from the JODN.
The caboose is spotted at the caboose track for servicing.
Kar Knocker has cleared the train and Big Mike is ready to block the incoming freight cars but not before taking some time to shoot the breeze with KK.
EBRR empty boxcars and APRR empty gondolas are coupled into train EB-3 going to North Side Yard for movement to their next NY-NJ loads.
Empty B&M RBLs will be moving out later in Train BT-27 for their next NY-NJ loads.
Over at Bedford Tower Train TY-2 from Selkirk heads to Terminal Yard with NY-NJ freight traffic from the APRR Rock Ridge Yard.
The TY-2 heads to Terminal Yard.
The TY-2 arrives in Terminal Yard.
Trainmen gather to check out the Cotton Belt pool power usually based at Collinwood Yard that came in with the TY-2 and is now in the engine terminal.
Senior engineer Sir Neal gets a last look at the foreign road power as he gets ready to board the EBRR U23Cs with full tanks of fuel and full sandboxes. 
The U-Boats are coupled onto the freight cars going to North Side Yard as train EB-3.
Meanwhile over at Bedford Tower Train TY-4 from Selkirk is getting orders as it moves towards Terminal Yard.
Train EB-3 departs Terminal Yard and meets Train TY-4. Hopefully on separate tracks!
Train TY-4 rolls into Terminal Yard.
CB&Q GP7 244 along with the rest of the TY-4 power is spotted at the fuel rack. Don't worry the guys will be over soon enough to photograph and check out the CBQ 244.
Meanwhile in Empire City EBRR Train EB-3 arrives in North Side Yard. We'll check back with the EBRR crew in a future post.
Back at Terminal Yard the terminal switcher pulls the cabooses from the TY-2 and TY-4.
The cabooses are shoved past the scrap pile into the caboose track.
Over in the yard Big Mike is making good headway blocking the NY-NJ freight traffic into local trains.
Three GULF tank cars of diesel fuel from the GULF facility in Linden, NJ are spotted at the Terminal Yard tank car unloading track.
Big Mike finishes up the yard work and has the yard in good shape.
We'll cut it here for today as Big Mike ties down the SD9s and corrals Wet Willie to join him at a nearby tavern making him an offer he can't refuse. C'mon Willie, I'm buying!!!
We'll pick it up tomorrow at the B&O 16th Street Yard.
This concludes Part 4 on the NYCTL. Be sure to catch all the action on Sir Neal's Atlantic Pacific Railroad.
Thanks for reading and watching!!!
See you tomorrow!!!