New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Wednesday, January 17, 2018

P.C.C.M. #42J

Greetings All,

Today we'll wrap up the P.C.C.M. 42 series with the Empire Belt Railroad taking center stage.

To: Terminal Yard, West Mill, Rock Ridge, Zenith Yard, 
       H.R.C. West Side Yard 
From: Empire Belt RR North Side Yard.

Placement, constructive placement and interchange of freight cars forwarded to the E.B.R.R.'s North Side Yard.


North Side Yard out...

1/87th scale senior engineer Sir Neal is giving today's Empire Belt crew some last minute instructions before heading out to oversee construction on the new A.P.R.R. Southern Division. 1/87th scale PC Ralph will be the lead engineer for the E.B.R.R. today.

Over at Terminal Yard 1/87th scale Engineer Ed and conductor AT JOE hold a similar briefing with the TY yardmaster as their power set idles on track 9. Engineer Ed and AT JOE will be on Double's E's favorite train, EC-1, the transfer run from Terminal Yard to Empire City's North Side Yard.
Bedford Tower operator 1/87th scale John B is out and ready to give PC Train EC-1 (Terminal Yard to Empire City) a high ball and roll by inspection.
EC -1 passing Hohman Ave Tower
1/87th scale Sir Larry is out and ready to greet EC-1 as it makes it way into Terminal Yard.
EC-1 arrives at Terminal Yard and cuts off it's train. The cars for EC-2 are sitting on track 3 with a pooled caboose.
1/87th scale EE has run the engines around to the Hohman Ave side of the yard and couples up to the freight cars that will make up EC-2. After a terminal brake test they'll be off to Terminal Yard.
Train EC-2 heads back to Terminal Yard.

With EC-2 now gone 1/87th scale PC Ralph and the Empire Belt RR crew gets to work on sorting and delivering the freight cars left by EC-1. The first move was to pull off the cars for the L.I.R.R. and two boxcars from Ralph's Grocery Warehouse. With five inbound cars today and spots for only three the Rock Island and PC boxcars will be considered constructively placed in North Side Yard and will be spotted once space becomes available.

The Empire Belt crosses over to the industrial main

With the caboose out of the way the E.B.R.R. engines shove into the Gervais Pipe / Ralph's Grocery siding to pull these cars.
Spotted at Ralph's grocery are P&LE  35892 loaded with bagged flour from Blue Ribbon Flour on Ralph's layout, E.B.R.R. 358150 loaded with paper products from Marcal Paper on Neal's layout and L.F.N.W. 160 loaded with canned foods from Oswego Manufacturing in West Egg , CA on John B's layout.
The crew has spotted this empty PC gondola at Gervais Pipe &  Fitting. They are now spotting one Cargill covered hopper loaded with grain from Empire Grain on Ralph's layout and three loaded PC covered hoppers from the large Cargill facility on Neal's layout at Empire City Cargill.
PC depressed center flatcar 766053 loaded with a Caterpillar excavator gets a royal welcome at E.C. Caterpillar. Caterpillar management, legal department, foremen and the E.C.P.D. are all happy to see the long lost excavator returned from the clutches of Sal Monella and his Sal's Salvage henchman.   
The E.B.R.R. crews heads over to the West Side across the Empire City viaduct.
First order of business is spotting NYC 50' boxcar 80775 loaded with new 55 gallon drums from Kings Port Steel at Drywell Inks.
BM 109 and 110 loaded with glass and mirrors from Corning Glass are spotted at Superior Furniture. Cushion cars with air pak load restraints makes these cars perfect for these shipments. Having 1/87th scale PC Ralph at the controls doesn't hurt either as he is very familiar with moving high cost and fragile loads.
The last move on the West Side is pulling TP&W 40' boxcar #627 from Walsh Steel Wool. The car is loaded with steel wool scrap for Boom's Ready Mix on the K.P.D.
The E.B.R.R. crew is back at North Side Yard and preparing for the arrival of the L.I.R.R. transfer run.
Cars for the L.I.R.R. include P&E 3638 and IC 30130 both loaded with packaged meals from Cavendish Fine Foods are consigned to Pilgrim State Hospital. The two Penn Central gondolas loaded with telephone poles from Bell Pole are headed to NYS DOT Region 10. All four loads originated on the K.P.D. 
1/87th scale PC Ralph and the crew have the yard ready for the L.I.R.R.'s arrival.
Like clockwork the L.I.R.R. makes it way thru Bedford NY towards Empire City's North Side Yard.
The L.I.R.R. arrives at North Side yard.
The cars from the L.I.R.R. are spotted on track 1 and the L.I.R.R. RS-1 has run around to couple up to the cars headed out to Long Island. 
The L.I.R.R. reclaims it's caboose and heads back towards Bedford NY.
Rolling thru Bedford NY towards Long Island tracks we catch the PC gondolas , IC and P&E boxcars bringing up the rear of the train.
P.C.C.M. 42J Addedendum
The following day we're back at North Side Yard shortly after 1/87th scale Engineer Ed and AT JOE have arrived with train EC-1. If we look past the UP boxcar we can see that excavator leaving Caterpillar on a low boy trailer with some sketchy paperwork having been submitted to transfer the unit.
Here is Double E shooting the morning breeze with 1/87th scale PC Ralph who is again filling in for senior engineer Sir Neal who is attending to matters on the A.P.R.R. Southern Division today.
With EC-2 gone the Empire Belt gets down to business placing RI 35062 loaded with grocery products from Ralph's Grocery Davenport, Iowa warehouse and PC 77047 loaded with Woodstock Hills All Natural Soda located in Kings Port NY.  
With the RI and PC cars spotted the E.B.R.R. engines head back to pick up three empty boxcars from Ralph's Grocery and the loaded PC gondola from Gervais Pipe sitting on the industrial lead. 
The E.B.R.R. gets busy in North Side Yard setting up Train EC-4 which will be leaving for Terminal Yard this afternoon. By late tonight the P&LE, E.B.R.R. and L.F.N.W. boxcars will be ready for loading and the gondola loaded with pipe should make the cut for PC Train LI-1 due out of Terminal Yard for Selkirk at 04:00 AM. We'll save these stories for P.C.C.M. 43.   
That wraps up the P.C.C.M. 42 series!
Thanks for watching and reading!

Tuesday, January 16, 2018

P.C.C.M. #42I

Greetings All,

Welcome back to the P.C.C.M. 42 series! Today we'll focus on the Coal Job and start the action at Hudson Coal.

That's none other than 1/87th scale senior engineer Sir Neal who's assigned to this train today showing off this morning's Coal Job power consisting of A.P.R.R. GP38 #358 and PC GP40 #3175 with A.P.R.R. caboose #58 assigned to bring up the markers. If you're thinking this is a bit fancy you're right. 1/87th scale Sir Neal is on a promotional tour letting Hudson Coal management know that their coal is in good hands with the PC and A.P.R.R transporting the black diamonds to RM.O. Electric on 1:1 Sir Neal's A.P.R.R. layout.
15 cars of black diamonds are ready to be pulled.
The Coal Job has coupled up to it's caboose and is heading out towards Bedford NY.
New and clean power is rare on these local coal drags. 
1/87th scale Sir Larry of Flemington is back on duty at the Hohman Ave tower and gives Sir Neal and the Coal Job a wave and an inspection as the train makes it's way thru the west side reverse track.
The Coal Job arrives at Terminal Yard and heads towards the weigh in motion scales.
Their run done 1/87th scale Sir Neal has tied up his motive power in the Terminal Yard engine terminal. Can you say half day!
A yard switcher gets to work pulling a caboose from the caboose track 
PRR N6B caboose #980196 is tacked onto the loaded coal hoppers.
That done the crew from the departure yard pulls the loaded coal hoppers towards a departure track.
Loads on track 6, empties on track 7. The crew shoves the A.P.R.R. caboose towards the caboose track.
That done another crew has been called for the Coal Job to spot the newly arrived empties from the A.P.R.R. and H.R.C. The PC RS2's  burbling away as the train builds up air pressure are a more normal Coal Job consist.
The anonymous Coal Job crew shoves the first 5 empties into Hudson Coal track 3.
Another block of five are in place on track 2 and the crew shoves the final five into track 1. 
With the empties spotted the Coal Job shoves back up towards Terminal Yard with their caboose in the lead. 
The RS-2 head towards the engine terminal and caboose track.
The caboose is spotted.
And the crew ties down their power.
Tomorrow we'll wrap up the 42 series following some Penn Central transfer runs and the Empire Belt Railroad as it makes it's moves thru Empire City and interchanges cars with the L.I.R.R. 


Thanks for reading! 

Monday, January 15, 2018

P.C.C.M. #42H

Greetings All,

The N.Y.C.T.L. is the proud recipient of freight cars from four layouts in our ground breaking FIVE layout virtual ops or Penn Central Car Movement. In this case the old adage, 'giving is better than receiving', may very well be true! 

If you're just tuning in check out the prior car movements that kicked off the 42 series and how these cars made their way from layout, to layout, to layout, to layout, to layout.

P.C.C.M. 42A. Engineer Ed's Hoschton Railway started us off.
P.C.C.M. 42B. John Bruce's L.F.N.W. RR sent some freight east.
P.C.C.M. 42C. Sir Neal's A.P.R.R. pulled some empty coal hoppers.
P.C.C.M. 42D. Sir Neal dispatches AP RW-1 to meet with PC NE-2
P.C.C.M. 42E. Sir Neal's RW-1 meets NE-2 at Weehawken NJ
Bonus video: Sir Neal videos PC NE-2 leaving Weehawken NJ
P.C.C.M. 42F. Ralph V's West Mill readies for the arrival of NE-2
P.C.C.M.42G. Ralph's West Mill add freight car to NE-2 and                                    forwards NE-2 to Selkirk. With bonus video!

Now that you're up to date let's get P.C.C.M. 42H started. 

To: Terminal Yard, Rock Ridge Yard
From: Selkirk Yard

P&LE 39635 has been removed from VN-4 consist with cracked truck and damaged brake pipe. Adjust train consist to reflect this change. Rock Ridge Yard freight agent to notify shipper of delay.

Selkirk out...

We'll pick up the action with PC Train VN-4 heading to Terminal Yard

To: West Mill, Rock Ridge, Zenith Yard, HRC West Side Yard.
From : Terminal Yard

Arrival of PC Train VN-4 ( Selkirk - Empire City) at Terminal Yard

PC Train VN-4 with some run thru power has come over the Cornelius Vanderbilt Bridge into Bedford NY and is now heading towards Terminal Yard.
A pair of Fairbanks Morse H16-44s and a Baldwin S12 are one of the yard power sets today. The yard crew awaits the arrival of VN-4 which they can hear coming up the grade behind Hudson Coal.
Train VN-4 arrives at Terminal Yard
A look at the VN-4 consist shows 15 empty coal hoppers from the A.P.R.R. and H.R.C. at the rear of the train.
A block of 57' Mechanical Reefers from California including an S.P.F.E. car from the L.F.N.W.
Four GP30s with a Union Pacific run thru unit are at the power and we can see a multitude of freight cars from the K.P.D, AP.R.R. and L.F.N.W. 
The yard crew has it's switch list and gets to work coupling up to the caboose and pulling the coal hoppers from the rear of the train.
The empty hoppers are placed on track 7 and ready to head out to Hudson Coal as soon as the next Coal Job is called.
The PFE car loaded with oranges from the Citrus Association Packing House in Sunkist, CA on John B's L.F.N.W. has reached the Cold Storage Warehouse. These reefer cars came onto the PC System from the C.N.W. Proviso Yard in Chicago and got to Selkirk via Train NY-2. Maybe that's how that UP GP30 got into the VN-4 consist?
Before working the rest of the train the yard crew picks up an E.B.R.R. caboose from the caboose track.
With the caboose placed on track 2 the yard crew pulls the newly arrived freight cars from VN-4 back thru the yard lead. Careful blocking at Rock Ridge, West Mill and Selkirk are paying big dividends today! There is little for the yard crew to do other than get the train onto the departure track. Four cars from West Mill for the L.I.R.R. make up block one.They'll be interchanged with the L.I.R.R. at North Side Yard.
A five car block from three different layouts for Ralph's Grocery Warehouse in Empire City is the next block. The L.F.N.W. 50' boxcar has traveled almost 3,000 miles!
Empty PC gondola 288673 will be spotted at Gervais Pipe & Fitting. Three loaded PC covered hoppers from the A.P.R.R.will go to Empire City Cargill along with the Cargill covered hopper from Empire Grain on the K.P.D.
The long lost caterpillar excavator is on it's way back to Empire City Caterpillar after an extended stay at or near Sal's Salvage on the K.P.D. Word is Sal was very reluctant to return this equipment. The NYC boxcar will be going to Drywell Inks with new 55 gallon drums from K.P. Steel and the two BM 50' RBL's are headed for Superior Furniture with new glass and mirrors from Corning Glass.
An Empire Belt RR caboose will bring up the markers on this train that will head out to North Side Yard tomorrow.
With the freight cars pulled from it VN-4's power now makes it's way into the engine terminal.
 And ties up on track 2.
 Next installment we'll call out the Coal Job
Thanks for reading and watching!

Friday, January 5, 2018

Vanquishing Zinc Rot

Greetings All,

Happy New Year everyone!

Like a 1:1 railroad looking to vanquish steam power once and for all to realize the economies of the diesel engine one of my goals for 2018 was to finally vanquish zinc rot from my locomotive fleet. Followers of this blog may recall that I've been fighting zinc rot issues in the frames of some of my Walthers FA-FB locomotives for years. 

Zinc rot also known as zinc pest results from lead impurities in the zinc alloy which leads the zinc to expand and crack in an irreversible process. Trust me on this. It's irreversible. For more on zinc rot click this link;  https://en.wikipedia.org/wiki/Zinc_pest 

I first documented by experiences with zinc rot in this December 2012 blog post . To try and repair the damage and get the engines back in service I turned to my bench grinder. Here is a ground down frame that allowed me a few more years of operation.

In the fall of 2016 I dealt with zinc rot issues again when my previously fixed FA-FB frames continued to expand and once again cracked the shells. This is the proof of irreversible damage. 

This time instead of the grinder I used a hacksaw to cut down the frame.

This repair allowed me to get the Lehigh Valley FA units back in service but the B unit frame was not repairable.
 
Following the advice of fellow model railroader and blogger John Bruce I decided at this point to try and find some replacement models on the used market. Fast forward to 2017 and I came across a couple of auctions on ebay for Walthers  FA-FB sets that looked to be free of the zinc rot plague. I won the auctions, one in July and a second in late December. Once I got the new engines it was a quick replacement of the old frame for the new ones. 

Here's the newly repaired fleet on January 1st, 2018;

A PRR FA-FB-FA on the Empire City viaduct with a new FB frame installed.
The Lehigh Valley FA-FB-FA lash up at Terminal Yard with new FA-FB frames installed. Note the shiny trucks.
A newly replaced A.T.S.F. FB frame allows this sharp looking FA-FB-FB-FA lash up to be operational. I know the Santa Fe did not have the FA-FB on their roster but they should have! They did have war bonnet PAs!
Last but not least is my favorite, the NYC FA-FB-FB-FA units in their lightning stripes. The trailing FA, #1043, had it's frame replaced in July 2017. Looks like a Lionel catalog picture!
As of today all of the FA and FB units look to be zinc rot free. Some are around 20 years old and I'm hoping my zinc rot fighting days are over. Thanks for tip John B! 

So what about the shells from the replacement frames? As of this writing I think we'll see some custom painted Empire Belt FA-FB units coming out of the Patti O Paint Shop this Spring. That's the plan for now anyway.
Thanks for reading!