New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Sunday, July 1, 2012

Hardwiring an old Athearn Locomotive for DC use


Greetings Blog Followers... While I am awaiting the arrival of my track I took the opportunity to run some of my older locomotives and discovered that an old favorite seemed to have lost some power. The locomotive in question is an Athearn SDP40 painted in the New Haven McGuinness livery. For the purists I know that the New Haven never had an SDP40. For the record the EMD SDP40 is similar to the EMD SD45 and the model sits on an SD45 frame. The easy to spot difference between the two is at the rear of the locomotive where the SDP40 has an extended long hood to accommodate a boiler. This particular Athearn model is at least 15 years old. It has the "newer" plastic side frames and gold colored motor with flywheels. Follow along as I inspect, locate and then repair the problem.

This is the unit with it's shell removed. Note the Kadee under set shank couplers (#47) with the plastic coupler box and screws. This is done to safe guard against any electrical shorts when connecting this locomotive back to back with another similar locomotive as the Athearn metal frame is grounded to the motor. Both couplers are exact fits with the Kadee coupler height gauge. If you are running consists of Athearn units with this type of electrical system this is the preferred coupler set up. 


This view shows that the "Power Strap" has significantly rusted. The sliding electrical connection at the rear truck and head light strap are compromised This is/was a common problem for Athearn Blue Box fleet and is an easy fix.    

A close up of the power strap and rear truck power contact. Not an ideal electrical connection. 
 

A Close up pf the power strap and headlight connection. 

Here is the motor with the power strap removed. The brass contact strip on type of the motor is clean and so are the truck contacts. This will make the job even easier. If you find on your locomotive(s) that the motor brass contact strip is extremely dirty and you need to remove it to clean it up use extreme caution as the motor brushes and springs are held in place by this power strip. If you have to wire brush or sandpaper the truck contacts uses extreme caution that you do not get any grit into the truck gears which are open at the top. 

A pretty clean truck power strip

A clean front truck power strip and headlight power strip.

The parts required for an easy repair. Flexible wire and a shortened and cleaned power strap.

  The power strap is cleaned and shortened. A copper flexible wire is cut to a approximate length and  we are ready to prepare for soldering. Note that I am using 60/40 rosin core solder and rosin core flux. In soldering remember that flux is your friend and the flux capacitor makes time travel possible. All kidding aside the flux cleans the work surface and allows the solder to melt and flow at a lower temperature. The first step is to add some flux to the shortened power strap and the truck contact strips.The second step is to solder the flexible wire to the shortened power strap while it is off the motor. Leave enough wire at both ends to make contact with the truck power strips.Step three is to solder the wire to the truck power strips. Step four (see below) is to solder the headlight power strip to a separate wire that is attached to the shortened power strap.


Here is the completed job. Note the small separate wire that is attached to the headlight power strip. This is an important addition as it allows the wire to the front truck to remain flexible so the truck will easily negotiate curves and uneven track surfaces. Since the copper wire is bare you must make certain that is does not contact the flywheels which will cause a short.

A top view of the finished job. Upon completion I cleaned the excess flux off with an alcohol pad. Since I had the alcohol pads out I used a another one to clean the motor armature.

A close up of the front truck and headlight wires. I used to just attach the headlight strap to the wire going to the front truck but learned the hard way that this causes the front truck to lose a lot of it's flexibility and leads to derailments. Going to this application has worked extremely well 

The unit has been tested and then retested with it's shell on. The unit is now running extremely well and the head light is bright with no flickering. Remember these are old school units. They simple in design and construction and they are pretty easy to troubleshoot and repair. After a light lube this locomotive is ready for another 15 years of service.

Monday, June 25, 2012

Track Purchasing Issues

Greetings Blog Followers.... Just wanted to add an update to the blog as I have not posted in awhile. The NYC train layout purchasing department has run into a bit of a snag in trying to purchase some Atlas Code 100 flex track. Since beginning the layout I have tried to buy used flex track in good condition to save on costs. I have had great luck until very recently using one of the HO Scale Yahoo Groups that I belong to. The latest "Want to Buy" posting looking for 20 pieces of track was answered by several would be sellers. I chose one seller offering used track in good condition and promptly sent him a money order to cover the agreed upon costs. The day after sending the money order my W.T.B. post was answered by a seller that I have bought most of my track from, more on that in a minute. The would be seller responds back to me that he has received the money order BUT he cannot ship right now because he is having a pre planned operation that was conveniently left out of his prior communications but  he will ship in a few days. The few days pass and another e-mail reports another shipping delay due to operation complications. Not wanting to burden this seller any further during his convalescence I informed him that he could just send back my money order and continue his mending process. He then assured me that my 20 pieces of flex track would be sent within the next two days. On this third would be shipping date I received an e-mail informing me that he did not actually have the quantity of track I had purchased BUT could send me a bunch of smaller pieces to make up the length. Again I requested that my money order be returned to me. Now guess what happened? The money order arrived in the mail. So this part ended OK as I was just out the postage, time and aggravation.

Now about the other seller he had new pieces of track to sell which is at a higher price than the used track I was going to purchase from the original seller.. Well once he had contacted me I replied back, apologized for not contacting him directly and explained that a deal was already in the works. I further informed him that should complications arise (and they surely did) that I would e-mail him back and purchase the track off of him.

So there it is another trip to the Post Office to get the money orders straightened out and I should be getting the track by the beginning of next week. All this to save some money. Would it have been easier to go to the local hobby shop and just purchase the track right there? Yes. Would it have cost me almost double the price I am paying now? Yes. Anyway having dealt with this seller several times I am confident that track laying will begin again next week. Stay tuned....

Sunday, June 3, 2012

Refurbished Merchant's Row I

After the completion of the Walther's kit Merchant's Row II it became readily apparent that the much older Merchant's Row would need to be re gentrified. The building suffered from a fire in one it's stores which was a great place to showcase my 1/87 scale fireman and fire apparatus. But after 15 years even the most sluggish volunteer fire company should have had this fire put out and taken up for the firehouse. Another issue facing this building was the learning curve as it was one of the first building kits I had built.  Here are some photos of the refurbished building....

 Dominick's Restaurant now occupies the former burnt out space. Charred bricks are still visible and add some character
 Mama & Papa's luncheonette is open daily for Breakfast and Lunch.
 Lin's Dress Shop is an original occupant in original paint
 Dara's Floral Shop is also an original occupant in original colors. The corner store is awaiting new management and will probably be a discount store
An aerial view shows a new billboard and some of the rooftop details.

Thursday, May 31, 2012

FM H16-44s Lead The Way

A New York Central freight train makes it way through the industrial district behind two Fairbanks-Morse H16-44s.  I custom painted these powerful locomotives back in October 2010. This is an older film of the layout and equipment. This area has been pretty much completed and the NYC jade green 50' double door boxcars have been renumbered.


Saturday, May 26, 2012

Merchants Row II

Here is the newest building for Empire City. It is a Merchants Row II kit from Walther's. The building features Reyneely's Restaurant, The Hitching Post Tavern, a Beauty Parlor, Mead Drug Store and Robert's books. Painting, assembly, decals and details took about four days. 







Monday, May 14, 2012

Temporary Loading of Express Baggage

As morning comes to Empire City the last of the head end express shipments are ready to get loaded. Both the Railway Express Agency and New York Central have been hustling through the night to load the various East and West bound intercity trains. Track #4 must be clear by 7:00 AM to allow the commuter trains access to all four tracks. At 10:00 AM a baggage and express train will call on track #4 to take on Express shipments and mail. The train will depart at 2:00 PM for Terminal Yard where the east bound and west bound cars will be separated, given new power and sent out on the rails to their respective destinations.

While this is a bit backward it allows the railroad to fulfill it's express obligations until a new Railway Express Building and mail loading facility are built. 

 Railway workers get themselves ready for the final assault on today's express shipments
 Conductor, Engineer and Fireman check their timepieces as they wait for the unloading and loading to commence
 New York Central Pacemaker trucks stand by as a forklift operator waits for the train doors to open. In the background the New Haven Patriot is on track #3 ready to depart for Boston, a New York Central train sits on track #2 and a freight train passes through on track #1 
The forklift operator assures the foreman he will strap the barrel to the pallet and careful when he loads  it into the car.   

Thursday, May 10, 2012

Word on the Street, Part II

What a difference a few hours makes. The streets of Empire City have come alive since the earlier post of "Word on the Street part I.

 An ambulance arrives at the request of the police to further assist in this code 10-56 "man down" call
 A CNN news truck "chases" the ambulance call a short distance away
 Both pedestrian and vehicular traffic build as morning progresses 
 Hotel guests are greeted by another sunny day in the big city
 Old friends meet, horns honk, people scurry to an fro. It's just another day in Empire City
 A friendly policeman keeps an eye on the kids waiting for the school bus
 Empire City residents know that Mickey has the freshest fruit in town. 
 The Electric Company is fine tuning the substation to ensure there is enough A/C for everyone today
Only a few spots left in the commuter parking lot as the morning rush hour winds down