Welcome to my Blog. The scope of this blog is to record the trials and tribulations of building and maintaining an HO scale layout, the trains and all of the ancillary projects that go with it. In 2017 New York Central subsidiary short line Empire Belt Railroad came into existence. The New York Central / Penn Central and Empire Belt are now the major railroads featured.
Empire Belt GP30s
Tuesday, January 17, 2012
The Next 8 Feet
As things have gotten back to normal after the Holidays I have turned my attention to the next 8 feet of railroad needing completion. After months of toying with so many different building placements and ideas for this 8 foot by 1 foot area along the back wall just beyond the highway overpass I have finally moved forward. Scenery is being installed and buildings are now dedicated to their sites. A second highway overpass that will be about eight feet from the one above is being built and some other scenery elements are being worked in as well. Work began yesterday, January 16th 2012, and progress has been slow but steady. Updates and pictures will be posted to show improvements to this area.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment