We have power. Trains are now rolling. NYC Track Inspectors have arrived and test trains are being run. At this time only two minor issues have cropped up and they were quickly repaired. Issue #1 was a slight dip on a curve that required a small shim. Issue #2 was a turnout causing momentary power loss which resulted from some paint on the points interrupting electrical contact. Testing will continue through out the next few days.
Stay Tuned.