New York Central Alcos

New York Central Alcos
NYC RS32 #2040 leads a trio of R32s hauling Train NY-4

Friday, February 24, 2017

P.C.C.M 28A

Greetings All,

Penn Central Car Movement #28 (P.C.C.M. 28) is underway!
Join us for the virtual operations between the New York Central Train Layout, Ralph V's Kings Port Division https://kingsportdivision.blogspot.com/ and Neal M's Atlantic Pacific Railroad.

The action for this series will originate on the N.Y.C.T.L. at the ever changing Bedford Park. Notification to West Mill Yard on the K.P.D. and Rock Ridge yard on the A.P.R.R. let's the others know the action has commenced. Let's get started;

To:     West Mill
           Rock Ridge
           Terminal Yard
From: Bedford Park Yard     
Dispatch of Bedford Park Turn

It'a a who's who of 1/87th scale trainmen today at Bedford Park Yard. 1/87th scale Sir Neal will be today's engineer, Engineer Ed will be the fireman, PC Ralph will be our brakeman, and Conductor John will be... that's right,  the conductor.
Today's power is ALCO RS-1 9921 still in PRR paint but numbered for the PC and our cabin car will be N8 #478080.
The first move is to pick up these two boxcars from American Hardware Supply. The P&LE Car is consigned to Peerless Appliance and the NYC Pacemaker car is consigned to Mike's Lumber Yard. 1/87th scale PC Ralph has hooked up the brake hoses and the train is building air pressure.
The tight confines of Bedford Park have the crew dropping the two 40'ers from American Hardware Supply in the yard before continuing over to work the Ford Plant. 
First move at Ford is to pull these two empty coil steel coaches.
The crew has dropped the steel cars on track 1 and is running around to get in front of them 
Showing why they are the crackerjack crew of the N.Y.C.T.L. the blocking begins at Bedford Park Yard. The two coil coaches going to Kings Port Steel are now coupled to the P&LE boxcar as all three will be heading to the Kings Port Division.   
The crew is back at Ford to pick up this empty NYC 86' boxcar that will be headed to ACME Auto Parts. Note the NYC Pacemaker car is a homemade track cleaning car. 
The B.P.T. is all coupled up and ready to head to Terminal Yard
Ahead of schedule again the train is held at Bedford Station by Tower Operator 1/87th  scale John B.
1/87th scale Sir Neal and Engineer Ed give a roll by inspection to a GE led freight train from Selkirk that is heading to Terminal Yard after just crossing the Commodore Vanderbilt Memorial Bridge.
GE's meet GE's as a PC Trailvan Train has just departed Terminal Yard enroute to Selkirk and points beyond.
The Trailvan Train passing Bedford Tower.
The B.P.T. is now in the clear and rolling thru Bedford NY. Next stop Terminal Yard
The B.P.T. is rolling thru the Terminal Yard tunnel where the crew will drop the train and check for any outbound cars going back to Bedford Park. 
Bedford Park out...

Stay tuned for P.C.C.M. 28B to follow shortly

Saturday, February 18, 2017

Tuscarora Mountain RR visit

Greetings All,

My good buddy 1:1 scale Engineer Ed arranged for us to visit this excellent two rail O scale layout. Have a look it was a very impressive layout and our host was most generous with his time and hospitality.  Check out these photos of this beautiful layout;



























Thanks for looking

Saturday, February 11, 2017

Draw Bars For Close Coupling and Coupler Mounting Alternatives

Greetings All,

A follow up from my prior post;
http://newyorkcentrallayout.blogspot.com/2017/02/building-box-car-kit.html

In my last post about building a shake the box kit fellow blogger and modeler John Bruce added comments on his method of installing Kadee couplers on the old tried and true Athearn Blue Box kits. I communicated with John and asked that he post a 'how to' on his blog. The timing was right as he had an Athearn Blue Box box car kit ready to build. John's approach offers a simple way to overcome the dreaded Athearn Coupler Box clip failure that most modelers have experienced at least once or in my case several times. I was impressed with the simplicity and effectiveness of the alternatives John employs on his car builds. Check it out here; Athearn Bluebox Upgrade

For more on John's modeling activities check out his other blog posts. He's always got an interesting project going;
https://modelrrmisc.blogspot.com/

Today's other topic deals with the alternative of using draw bars instead of couplers in some applications. The recent painting of NYC F7A #1645 led to another project of getting the 1645 and 1644 to couple closely together. Years ago I used the Kadee close coupling kits for Bachmann F units but was never really happy with them. Along the way I came up with a very simple draw bar system to get my Bachmann units closely coupled. This same system can also be used with Athearn BB units.

The Kadee close coupling kit
Image result for new york central F7 abba 
I used the Kadee close coupling kits above on these FT units. 
Not that close are they?
 
This is after the draw bar conversion. Much better
The idea for the draw bars came from a magazine article I read in Classic Trains magazine about ten years ago about the Lackawanna draw bar equipping their FT A and B units. 

The first units I tried the draw bar conversion on were a pair of Athearn BB New Haven F7As in 2012


One thing about these projects is that the modifications are easily reversible if you want to go back to a regular coupler. 

After installing the draw bar for the 1644 and 1645 I turned my attention to an A-B-B-A set of PRR F7s and an A-B-A set of B&O F units.. Let's take a look at this super easy way to get the units looking more prototypical; 

The 1645 and 1644 sitting at Bedford Station coupled by draw bar.

 An A-B-A set of F7s in need of draw bars. The F7A to the left and the B unit have had the close coupling kit installed. It's a little closer than the standard Bachmann coupler boxes. But not that much.
With a Christmas delivery of an A and B unit to the P.R.R. fleet of my son I secured permission to use draw bars to couple these units together. Seeing these 1:1 scale units in the Green Frog Pennsylvania RR Heritage video sealed the deal for this project.  
This consist is going to be tough to get back into their respective boxes! The four unit lash up looks great and runs great. It really looks good at the slow speed train crawl with about 25 to 35 cars behind it. 
Here are the B&O units getting ready for their drawbars. The draw bars are made from old IHC /AHM / Rivarossi light weight 2 axle long shank horn hook couplers. I cut off everything and just use the shank. Note when doing a multi unit lash up I make sure I can mate two F7s together before proceeding with the B units.  
 The B&O A-B-A units close coupled and looking good. Another consist that's going to be hard to put away.
The obligatory meet on the Empire City viaduct. Another B&O B unit is now on the shopping list.
As I enjoyed running these engines on the layout it struck me that I had another set of A-B-A units that could benefit from the draw bar application. An Athearn BB New York Central PA-PB-PA to be exact. So back to the work bench I went and here's what happened;

The Athearn PA-PB-PA units coupled up nice and tight at Empire City Station 
 These units have talgo mounted couplers. Note the washers on the B unit lowering the draw bar. This is necessary so the weight of the A units pin sitting on the draw bar doesn't raise the rear wheel of the B units truck off the rails. The amount of washers used was based on trial and error.
The bottom of the unpowered B unit shows the draw bar on one end and the pin on the other. Obviously the A unit to the left is equipped with a draw bar and the A unit t the right a pin. The masonite pad turns this car into a track cleaner which I really like.
Four roofing nails attached to the pad with adhesive. The slide thru the empty motor mount holes in the bottom of the frame. Note the nails are off center which coincides with the empty motor mount holes.
The PA-PB-PA units lead a passenger train around a curve coming out of Empire City Station

The PA-PB-PA climb the grade thru Bedford NY as the train heads towards Terminal Yard and points beyond the layout. The two powered PA units have plenty of power for the grade and the B unit is shining the tracks as it goes. Not a bad combination!
So there it is. A couple of easy upgrades that are cost effective and easily reversible if you should decide later to undo the draw bars.

Thanks for reading!!!