Blog Roll

▼

Saturday, September 26, 2026

New York New Jersey Ops #4 / Part 5 / NYNJ Traffic Begins to Get Delivered

   Greetings All,

Welcome Back to New York - New Jersey Ops #4!!!
Our two layout virtual op with the NYCTL interchanging freight traffic with Sir Neal's Atlantic Pacific Railroad continues today with inbound NY-NJ freight traffic from Rock Ridge Yard getting moved to their intended consignees and interchanges.

We open  the action today in Terminal Yard with the terminal switcher coupling a caboose onto the NYNJ freight cars going to the Bedford Park Ford Plant.
The terminal switcher sets up the NYNJ freight traffic for the Bedford Park Ford Plant on track #8.
Over in Bedford Park Yard PC engineer Robrt R is reporting for duty.
The Bedford Park Yard Job starts the day at the Ford Plant pulling empty non  NYNJ boxcars and flatcars.
Empty boxcars and flatcars are pulled from the B and C tracks.
Empty 60' NYC boxcars pulled from the A track get coupled onto the BPYJ caboose.
Robert R brings the BPYJ out to Bedford Tower and awaits clearance from the dispatcher to proceed to Terminal Yard as Train BP-12.
Train BP-12 makes its run to Terminal Yard.
After cutting off from the BP-12 freight consist engineer Robert R. couples his Alco RS2s onto the BP-41 freight consist for its shove move to Bedford Park Yard.
PC Train BP-41 is shoved to Bedford Park Yark.
The BP-41 is back in Bedford Park Yard and begins its work servicing the Ford Plant by shoving three empty B&O auto racks into the B and C tracks for their next NYNJ loads of automobiles.
Three loaded 86' boxcars from IDEAL Auto Parts including the below EBRR 86'er get shoved into the A track for unloading.
Two loaded APRR 86'ers from IDEAL Auto Parts round out the three loaded boxcars from IDEAL being shoved into the A track for unloading.
After servicing the Ford Plant Robert R. takes care of some non NYNJ business pulling a pair of boxcars from All-City Storage.
The empty boxcars are placed in Bedford Park Yard to await their next move to Terminal Yard. Robert R ties down the Alcos on the #2 track and heads for beans.
Back at Terminal Yard a quartet of B-Boats couple up to Train TYBN (Terminal Yard-BN Yard) for movement to BN Yard in the Bronx
to deliver the four gondolas of steel products from Shapeless Steel to Century Steel.
Train TYBN makes its run to BN Yard.
We'll cut it here for today with TYBN heading into the Bronx to deliver the train to BN Yard.
We'll pick it tomorrow with Big Mike building Train EC-1, the transfer freight from Terminal Yard to North Side Yard.
This concludes part 5 on the NYCTL. Be sure to catch all the action on Sir Neal's Atlantic Pacific Railroad.
Thanks for reading and watching!!!
See you tomorrow!!! 

2 comments:

  1. To: Terminal Yard / North Side Yard

    From: Rock Ridge Yard/Rock Ridge East Yard

    Acknowledgement – Bedford Park Yard Job works Ford Plant
    Acknowledgement – Yard Job completed
    Acknowledgement – Train BP-12 departs Bedford for Terminal Yard
    Acknowledgement – Train BP-12 arrives at Terminal Yard
    Acknowledgement – Train BP-41 shoves back to Bedford Park Yard
    Acknowledgement – Train BP-41 arrives at Bedford and starts working Beford Ford Plant
    Acknowledgement – Train TYBN departs Terminal Yard for BN Yard in Bronx, NY

    Rock Ridge Yard out!

    Terminal Yard continues to move freight out quickly. Bedford Turn ran smoothly. I like the fact that you have the RS-2 units on the Bedford runs. Something about that look that impresses me. Congratulations on adding a new consignee to the NYCTL operations; Century Steel. Shapeless Steel welcomes the new business! Adding the 4 U-Boat move on this initial run was very impressive.

    Great runs and looking forward to more moves!!

    ReplyDelete
    Replies
    1. Thank you very much Sir Neal!! The RS2s seemed to have found a home in Bedford Park. Based on our conversations it was time for some U-boats to get into the action:

      Delete